Production Planning & Control
European certification in industrial production planning and control. Mastery of flows, MRP/ERP, scheduling and continuous improvement according to European standards.
Key skills
- ✓Production planning and requirements calculation (MRP/MRP2)
- ✓Scheduling and capacity management (APS, scheduling)
- ✓Flow and internal supply chain management (kanban, pull/push flows)
- ✓Continuous improvement and industrial performance (OEE, SMED, 5S)
The question bank for this exam is prepared after your purchase. The exam is available no later than 48 hours after payment; you will receive an email as soon as it opens.
Is this right for you?
✓ This certification is right for you if:
- →Production planners and schedulers
- →Flow and internal supply chain managers
- →Methods and continuous improvement engineers
- →Production supervisors and team leaders
✗ This certification is not suitable if:
- →Beginners without industrial experience: first look towards on-the-job training or an operator/technician role before tackling planning.
- →Experienced industrial directors and supply chain managers: the PROVA Master 801 certification in Supply Chain Strategy or Fellow Series in Operational Excellence will be more suited to your level.
Prerequisites & eligibility
Minimum 2 years' professional experience in an industrial environment or a Bac+2/3 level qualification in production management.
Purchase options
Exam voucher, LMS pathway, bundle packs — build your order
Options d'achat
Composez votre parcours — voucher d'examen, préparation LMS, packs entreprise.
Skills assessed
MRP/ERP planning
Calculate net requirements, manage bills of materials and parameterise industrial planning systems.
Optimised scheduling
Build realistic production schedules integrating capacity constraints and customer priorities.
Flow management
Synchronise physical and information flows between workstations according to Lean principles.
Industrial performance
Measure and improve key indicators (OEE, service rate, stock turnover) through structured approaches.
Exam format
Curriculum
Requirements planning and MRP calculation
Single and multi-level bill of materials (BOM) structures, usage coefficients. Net requirements calculation (NRC): gross requirements, available stock, scheduled receipts, net requirements. MRP parameter setting: lead times, lot sizes (fixed, economic, period), safety stock and reorder points. Item management: make-to-stock, make-to-order, assemble-to-order strategies. Infinite capacity planning and MPS (Master Production Schedule). DRP (Distribution Requirements Planning) for multi-site networks.
Scheduling and capacity management
Load/capacity analysis: load calculation per workstation, load profiles, balancing. Finite capacity planning: resource constraints, order overlapping and splitting. Scheduling rules: FIFO, LIFO, SPT (Shortest Processing Time), EDD (Earliest Due Date), CR (Critical Ratio). APS (Advanced Planning & Scheduling) tools and optimisation algorithms. Theory of Constraints (TOC): identification and exploitation of bottlenecks, DBR (Drum-Buffer-Rope). Earliest/latest milestone planning, critical path. Load levelling and overload management.
Flow and internal supply chain management
Push flows (MRP) vs pull flows (kanban): advantages, limitations, hybridisation. Kanban systems: sizing, number of cards, kanban loops, supermarket. CONWIP (Constant Work In Process) and work-in-progress management. Inter-station flow synchronisation: pacemaker, FIFO lanes, mixed sequencing. Value Stream Mapping (VSM): current/future state mapping, identification of waste (muda). DDMRP (Demand Driven MRP): buffer positioning, decoupling. Work-in-progress and WIP management: impact on lead time and cash.
Performance and continuous improvement
Performance indicators: OEE (Overall Equipment Effectiveness) and its components (availability, performance, quality), TRS, customer service rate, stock turnover, stock coverage. Production dashboard and reporting. Variance analysis: forecasts vs actuals, causes of deviations. SMED (Single Minute Exchange of Die): analysis and reduction of changeover times. 5S: methodology and maintenance. Problem solving: PDCA cycle, Ishikawa diagram, 5 Whys, Pareto. Work standards and continuous improvement (kaizen).
How to fund your certification
3 ways to cover the cost of your certification
OPCO — Employer funding
Ask your employer to cover the cost through your OPCO (employee training plan).
Personal — €380 incl. VAT
Secure online payment by credit card (Stripe).
Business rate: €495 excl. VAT
Business — custom quote
Teams, cohorts or private catalogue: a quote tailored to your volumes and goals.
Frequently asked questions
Does this certification cover specific ERP software?
The certification is vendor-agnostic (SAP, Oracle, Sage, Divalto). It assesses the universal concepts of MRP/MRP2 planning applicable to any system.
What is the difference with APICS (CPIM) certifications?
PROVA Production Planning & Control is aligned with European practices and standards (ISO 9001, EN, EU directives), with a European Lean Manufacturing approach.
Are Lean and Six Sigma covered?
Essential Lean principles for planning (VSM, pull flow, kanban, SMED) are integrated. For complete mastery of Lean Manufacturing or Six Sigma, dedicated certifications exist in the PROVA catalogue.
Is the certification recognised by European industrial companies?
Recruiters appreciate the EQF level 6 alignment (equivalent to Bachelor's degree) and immediate public verification via QR code, eliminating common CV fraud.
Your certification pathway
Before, during, after — the recommended progression
Droits du candidat
Transparence
Les critères de décision et le barème sont documentés et accessibles avant l'examen.
Droit d'appel
Toute décision peut être contestée dans les 30 jours. Examen par un tiers indépendant.
Plainte
Toute personne peut signaler un dysfonctionnement. Formulaire public accessible sans compte.